Working group of DUGLAS ALLIANCE LTD. carried out an inspection of the state of the packaging of equipment manufactured by GE Hydro France for the Sendje Project: turbines, generators, regulation systems, excitation systems, control systems, power transformers, GIS.
In the course of the inspection, the specialists of DUGLAS ALLIANCE LTD. have ascertained that the equipment has been manufactured in full, packed and stored in accordance with the requirements of the storage instructions in the warehouses of the manufacturing factories. During the trip, the working group examined in total more than 1,300 packages at eight different factories in France, Italy and Turkey.
Subsequent to the results of the final inspection, the Company’s employees held talks with representatives of GE Hydro France, during which they discussed the shipping order of equipment to the Republic of Equatorial Guinea, established the terms and schedule for the implementation of the agreements reached. Now the preparations are being made for the shipment of equipment to the construction site in the Republic of Equatorial Guinea.